Here is a little sample of where the project is and where it is heading.
I hate to admit it but making silly movies is a lot of fun, plus it keeps me away from the back breaking hill. This project may have to be completed in more than two phases. Keep in mind that my background in handiness was to call someone else to do the job. this is taking a lot of figuring out as I work along.
Phase One was the completion of steps to reach a second tier on the hill. (DONE)
Phase Two is the completion of the second tier by erecting a 4 feet tall retaining wall and creating a 6 feet wide flower bed. (IN PROGRESS)
Phase Three is filling behind the second retaining wall with dirt. On the West side, the wall will be flushed agaist the hill with very little filiing to be done behind it. On the East side, the wall will require to be filled with dirt 4 feet deep. That is a lot of dirt to be dragged up the hill. (REGRETING IT)
Phase Four is to level the top of the East side of the second wall and creating a third tier on the hill. I calculate that it should give me about extra 12 feet of flat surface. (WHY DOES GOD HATE ME)
Phase Five is to create a path from the top of the steps, Phase One, to the top of the third tier, Phase Four. (PLANING IT)
Phase Six is to create a water feature next to the steps, Phase One. (DREAMING IT)